ASCE ASCE 71-21

ASCE 71-21 PDF Download

Standard EN Sample
ASCE 71-21 Sample

Identifying, Quantifying, and Proving Loss of Productivity

SKU163768477 Published by American Society of Civil Engineers ASCE Publication Date2021-05-04 Pages CountPages49

Full Description

Prepared by the Standards Committee for Identifying, Quantifying, and Proving Loss of Productivity of the Construction Institute of ASCE

Identifying, Quantifying, and Proving Loss of Productivity, ANSI/ASCE/CI 71-21, describes key labor costs as typically the most variable, and a major component of, overall project cost. It provides guidance on tracking and measuring labor productivity to help prevent, mitigate, and recover cost overruns and to address loss of productivity disputes and claims, which are increasing in frequency and magnitude.

Topics include defining productivity and related terms; preparing, collecting, validating, and analyzing productivity data; detecting the presence and extent of disruptive events; preferred methodologies for quantifying productivity loss; and avoiding conditions that create productivity loss.

ASCE 71-21 is written from and applicable to a variety of perspectives, including but not limited to those of owners, designers, contractors, attorneys, mediators, triers-of-fact, educators, and researchers; construction-only, design-only, and design-construct projects; small and large projects; public and private work; and international and domestic contexts.

Details
Language(s)English
ISBN9780784415429
File Size2.1 MB
Purchase Right after completing the purchase process, you will immediately get a digital copy of this standard which is: Not Locked Printable Multi-User $ 18.00